Power Systems
GOAL: Minimize the overall cost to meet power load over a given time horizon
DECISIONS: Determine the set of units to commit and their levels of operation (which plants on Automatic Generation Control)
RESTRICTIONS:
- Must maintain load
- Meet safety requirement
- Ramping times, switching limits